Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
2021-01-04
01
Commonly used joint forms for welding
Butt joint
Lap joint
Corner joint
T-shaped joint
02
The spatial position of the weld
Flat welding
Horizontal welding
Vertical welding
Overhead welding
All position welding
03
Pressure Vessel production process
The manufacturing process of pressure vessels can generally be divided into: raw material acceptance process, scribing process, cutting process, rust removal process, machining process, rolling process, assembly process, and welding process, non-destructive testing process, hole opening and scribing process, general inspection process, heat treatment process, pressure test process, anti-corrosion process.
04
Weldment production steps
The process of welded structure production mainly includes:
a. Material preparation: steel straightening, treatment, and outlining.
b. Cutting and blanking: required shape through cold processing, such as shearing, sawing, etc.; or through heat processing like gas cutting, plasma arc cutting, air carbon arc cutting, etc.
c. Bevel processing and workpiece forming
The groove processing of welded joints includes groove forming processing before welding and carbon arc gouging of the root of the weld.
For components with different angles or curved surface requirements, methods such as flanging, bending, pressing, and linear heating are used to plastically deform the steel plate into the required shape. This process is called forming processing.
4. Assembly
Assembly is generally performed on a platform or tire frame. The basic requirements for the assembly process include the following: (1) The components should not move, tilt, or twist after installation and positioning. (2) Ensure that the assembly structure meets the requirements of the drawings and the joints meet the requirements of the welding assembly process. (3) Conduct quality inspection on the assembly structure to meet technical requirements.
5. Welding
6. Inspection
The production process should be strictly followed. From material preparation, steel straightening, cutting and bevel processing to assembly, fixing and welding, quality inspection must be carried out.
Share to:
Send Inquiry
Ms. Abby
Tel:+86-020-82453507
Fax:
Mobile Phone:+8613662249479
Email:jmheatexchanger@163.com
Address:No.73, Bigang Road, Nangang Street, Huangpu District, , Guangzhou, Guangdong
Related Products List
Mobile Site
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.